Rock Curtains that Survive


The rock curtains on a scalping screen of our Pilbara iron ore client were lasting a little more than a as a week due to excessive wear and the curtains tearing. This resulted in unnecessary unproductive downtime and maintenance costs.   Trelleborg designed a bespoke solution incorporating multilayer reinforced construction View More »



March 24, 2014

Trelleborg’s “Total Turn Key Service” for composite ceramic lining packages in full swing – another success story


Trelleborg recently received an enquiry from an Iron Ore producer for a ceramic abrasion lining and fabrication package. After completion of detail drafting packages for both the liner system and fabrication we arranged fabrication and met all ITP requirements. We then cut all the composite ceramic liners, trial fitted the View More »